Find answers to frequently asked questions about the Central Forest Spine, biodiversity and conservation efforts.
The Primary Linkage (PL) is a critical area for re-establishing forest connectivity within the CFS, comprising a combination of Permanent Forest Reserves (HSK) and State Land Forests (HTK). It forms a continuous network of interconnected habitats and biodiversity areas, with forest islands connected to provide corridors for large mammals to move between habitats or forage from one forest to another.
The Secondary Linkage (SL) complements the Primary Linkage and consists of a combination of limited Permanent Forest Reserves (HSK) and State Land Forests (HTK), forest islands, agricultural areas, water bodies, and built-up areas. It is located in areas that are unsuitable for Primary Linkages due to physical, land-use, biological, and socio-economic factors. The stepping-stone concept is suitable for the movement of certain small vertebrate populations and some large mammal species.
The Ecological Network (RE) refers to forest habitats that connect or facilitate wildlife movement between forest islands within the CFS, either through existing natural forested networks or movement corridors such as rivers, valleys, and ridges.
Rapid development in the present day has led to the opening of new areas for various development activities, whether for agricultural or built-up purposes. In general, land-use changes significantly alter the composition of forest landscapes within the Ecological Network.
Therefore, the strategies and guidelines for CFS conservation outlined in this master plan should be integrated into development plans to ensure that land-use planning and development take into consideration their implications on forest ecosystems, thereby reducing the overall negative impacts on the environment.
The formulation of these strategies is also important for rebuilding, maintaining and enhancing connectivity between fragmented forest areas to establish a connected forest network across Peninsular Malaysia. In addition to helping preserve wildlife corridors, a well-connected forest network also plays a role in absorbing greenhouse gases and maintaining existing biodiversity assets.
The criteria taken into consideration in determining the boundaries of the CFS Ecological Network are as follows:
There are more than 500 PRFs within the CFS area, covering 4.79 million hectares across eight states—Johor, Kedah, Kelantan, Negeri Sembilan, Pahang, Perak, Selangor and Terengganu—and involving 58 districts.
The criteria taken into consideration in determining the boundaries of the CFS Ecological Network are as follows:
The total number of CFS Ecological Networks is 39, with the breakdown by state as follows:
Johor (3)
Kedah (1)
Kelantan (3)
Pahang (6)
Perak (5)
Terengganu (2)
Kedah (3)
Kelantan (3)
Pahang (3)
Perak (3)
Selangor (2)
Terengganu (2)
Negeri Sembilan (3)
19 out of 39 CFS Ecological Networks are in a threatened condition. The breakdown by state is as follows:
The main factors placing these Ecological Linkages under threat are the significant expansion of agricultural areas, loss of forest connectivity and increased land-use activities.
Malaysia’s last Sumatran rhinoceros was confirmed to have died at the Borneo Rhino Sanctuary in November 2019, while the National Tiger Survey recorded fewer than 200 Malayan Tigers in Malaysia in 2018.
The last Sumatran Rhinoceros in Malaysia was confirmed dead at the Borneo Rhinoceros Sanctuary in November 2019, while the National Tiger Survey recorded fewer than 200 Malayan Tigers in Malaysia in 2018.
Five major wildlife species (the Big 5) that are increasingly threatened can be found within the CFS Ecological Network (RE), namely the Asian Elephant, Malayan Tapir, Malayan Sun Bear, Malayan Leopard, and Malayan Tiger.
From 2017 to 2019, 1,092 wildlife deaths were recorded as a result of roadkill, of which 22 occurred within CFS Ecological Linkages areas. These included Elephants (3), Tapirs (4) and Leopards (4).
From 2010 to 2018, an annual average of 6,370 HWC complaints was recorded involving macaques, wild boars, elephants, common palm civets and pig-tailed macaques. Losses attributed to HWC were valued at RM25.1 million from 2013 to 2018.
The purpose of constructing viaducts is to reduce human-wildlife conflicts, prevent wildlife deaths caused by vehicle collisions (roadkill), and ensure ecosystem connectivity as well as the movement of large and medium-sized wildlife such as elephants, tigers, tapirs, and other species that require extensive home ranges.
To date, three underpass-type viaducts have been constructed under the Central Forest Spine (CFS) initiative in Peninsular Malaysia, namely:
All of these viaducts were developed at carefully selected locations based on ecological studies, species distribution and wildlife movement records. Their construction has not only helped to reduce roadkill incidents involving wildlife but has also strengthened forest landscape connectivity, thereby contributing to national biodiversity conservation efforts.
PIRECFS 2022 outlines five (5) objectives, 14 strategies, 38 actions and 228 initiatives to ensure that the CFS Ecological Network (RE) in Peninsular Malaysia and the nation’s biodiversity are preserved more effectively and sustainably. These strategies, actions and initiatives are grouped under the following objectives:
PIRECFS 2022 is prepared in two separate volumes, whereby Volume 1 focuses on CFS conservation and the overall Ecological Network. Volume 2 is prepared by state, comprising eight separate reports.
The PIRECFS 2022 outlines five (5) objectives, 14 strategies, 38 actions, and 228 initiatives to ensure that the CFS Ecological Network (RE CFS) in Peninsular Malaysia and the country’s biodiversity are preserved more effectively and implemented in a practical and sustainable manner. These strategies, actions, and initiatives are structured under the following objectives:
This Master Plan has been formulated in alignment with and in accordance with the existing policy framework, particularly the National Tiger Conservation Action Plan and the International Elephant Conservation Action Plan, to ensure the establishment and maintenance of interconnected forest networks that support the conservation of habitats and facilitate the movement of these wildlife species.
Rapid development is driving the opening of new areas for various development activities, including agriculture and built-up development. In general, land-use changes have significantly altered the composition of forest landscapes within Ecological Linkages.
Oleh yang demikian strategi serta panduan pemeliharaan CFS di dalam pelan induk ini seharusnya diintegrasikan ke dalam rancangan pemajuan bagi memastikan perancangan guna tanah dan pembangunan mengambil kira implikasinya kepada ekosistem hutan seterusnya dapat mengurangkan kesan negatif kepada alam sekitar secara keseluruhan.
Pembentukan strategi ini juga penting untuk membina semula, mengekalkan dan meningkatkan hubungan antara kawasan hutan yang terpisah bagi mewujudkan satu rangkaian hutan yang bersambung di Semenanjung Malaysia. Selain membantu memelihara laluan hidupan liar, rangkaian hutan yang baik turut berperanan menyerap gas rumah hijau dan mengekalkan aset biodiversiti sedia ada.
Malaysia remains committed to environmental conservation through its participation in global agreements on wildlife and forestry conservation. The Central Forest Spine Ecological Network Master Plan (PIRECFS 2022), with the vision ‘Reconnecting the Forests’, encompasses ongoing efforts to preserve biodiversity.
Wildlife crossings or viaducts are bridge structures or specially designed passages constructed above or below roads to allow wildlife to cross safely. Viaducts are built to reconnect forest areas that have been separated by the construction of roads, highways or other infrastructure. These viaducts serve as corridors, roaming areas and feeding areas for wildlife.
The criteria taken into consideration in selecting Permanent Forest Reserves (HSK) within the CFS Ecological Network are as follows:
Jalur hutan tanpa putus yang menyambung terus dua kompleks hutan besar, menjadi laluan utama haiwan besar seperti Harimau dan Gajah.
Rangkaian “batu loncatan” hutan kecil yang menyambung kawasan terpisah ke Rangkaian Utama, melintasi ladang dan kawasan penduduk.
Mengukuhkan Pemakaian Peruntukan Undang-Undang Akta Orang Asli 1954 (Akta 134)
| Bil | Inisiatif | Pelaksana Utama | Pelaksana Sokongan | Fasa Perlaksanaan | Tahap Kepentingan Perlaksanaan Red ActionSangat Penting, Memerlukan Tindakan SegeraYellow ActionPenting, Boleh Dijalankan Secara SederhanaGreen ActionPerlu Kajian Terperinci Sebelum Pelaksanaan |
|---|---|---|---|---|---|
| 1 | Menggunakan sepenuhnya RT untuk melaksanakan pengurusan tanah hutan dalam negeri secara bersama. | PLANMalaysia @Negeri | I. PBN II. JPN PBPT III. PDT / PTD / PTJ | Fasa 1 Fasa 2 | Red Action |
| 2 | Sempadan kawasan CFS dan Rangkaian Ekologi perlu dimasukkan ke dalam RT bagi memastikan cadangan yang disediakan di dalam Pelan Induk Rangkaian Ekologi CFS 2022 diwartakan bersekali dengan RT di bawah peruntukan Akta 172. | PLANMalaysia @Negeri | I. PBPT II. JPN | Fasa 1 Fasa 2 | Red Action |
| 3 | Mengambil kira Kawasan Sensitif Alam Sekitar (KSAS) di dalam kawasan CFS dengan menyediakan analisis dan cadangan di dalam RT bagi memastikan semua KSAS dipelihara dengan baik. | PLANMalaysia @Negeri | I. PBPT II. PDT / PTD / PTJ III. JPN | Fasa 1 Fasa 2 | Red Action |
| 4 | Semua HTK di dalam daerah dicadangkan untuk diwartakan sebagai HSK. | PLANMalaysia @Negeri | I. PBN II. PDT / PTD / PTJ III. JPN | Fasa 1 Fasa 2 | Red Action |
| 5 | Mengambil kira Kawasan Sensitif Alam Sekitar (KSAS) di dalam kawasan CFS dengan menyediakan analisis dan cadangan di dalam RT bagi memastikan semua KSAS dipelihara dengan baik. | PLANMalaysia @Negeri | I. PBN II. PBPT III. PDT / PTD / PTJ IV. JPN V. JAS VI. JMG VII. JPS VIII. Jabatan Pertanian IX. Jabatan PERHILITAN X. JWN | Fasa 1 Fasa 2 | Red Action |
| 6 | Menyediakan zon penampan di sekitar Rangkaian Ekologi bagi memastikan aktiviti guna tanah di kawasan sekitar selaras dan menyokong peranan Rangkaian Ekologi bagi menghubungkan hutan yang terpisah. | PLANMalaysia @Negeri | I. PBN II. PTG III. JPN IV. JPS V. Jabatan PERHILITAN VI. PBPT VII. PDT / PTD / PTJ | Fasa 1 Fasa 2 | Red Action |
A continuous forest corridor that directly connects two major forest complexes, providing a primary movement route for large wildlife such as tigers and elephants.
A network of small forest “stepping stones” that connects isolated areas to a Primary Linkage across plantations and settlements.
Memperincikan Cadangan Guna Tanah dan Pemeliharaan Kawasan CFS di dalam Rancangan Tempatan (RT).
| Bil | Inisiatif | Pelaksana Utama | Pelaksana Sokongan | Fasa Perlaksanaan | Tahap Kepentingan Perlaksanaan Red ActionSangat Penting, Memerlukan Tindakan SegeraYellow ActionPenting, Boleh Dijalankan Secara SederhanaGreen ActionPerlu Kajian Terperinci Sebelum Pelaksanaan |
|---|---|---|---|---|---|
| 1 | Menggunakan sepenuhnya RT untuk melaksanakan pengurusan tanah hutan dalam negeri secara bersama. | PLANMalaysia @Negeri | I. PBN II. JPN PBPT III. PDT / PTD / PTJ | Fasa 1 Fasa 2 | Red Action |
| 2 | Sempadan kawasan CFS dan Rangkaian Ekologi perlu dimasukkan ke dalam RT bagi memastikan cadangan yang disediakan di dalam Pelan Induk Rangkaian Ekologi CFS 2022 diwartakan bersekali dengan RT di bawah peruntukan Akta 172. | PLANMalaysia @Negeri | I. PBPT II. JPN | Fasa 1 Fasa 2 | Red Action |
| 3 | Mengambil kira Kawasan Sensitif Alam Sekitar (KSAS) di dalam kawasan CFS dengan menyediakan analisis dan cadangan di dalam RT bagi memastikan semua KSAS dipelihara dengan baik. | PLANMalaysia @Negeri | I. PBPT II. PDT / PTD / PTJ III. JPN | Fasa 1 Fasa 2 | Red Action |
| 4 | Semua HTK di dalam daerah dicadangkan untuk diwartakan sebagai HSK. | PLANMalaysia @Negeri | I. PBN II. PDT / PTD / PTJ III. JPN | Fasa 1 Fasa 2 | Red Action |
| 5 | Mengambil kira Kawasan Sensitif Alam Sekitar (KSAS) di dalam kawasan CFS dengan menyediakan analisis dan cadangan di dalam RT bagi memastikan semua KSAS dipelihara dengan baik. | PLANMalaysia @Negeri | I. PBN II. PBPT III. PDT / PTD / PTJ IV. JPN V. JAS VI. JMG VII. JPS VIII. Jabatan Pertanian IX. Jabatan PERHILITAN X. JWN | Fasa 1 Fasa 2 | Red Action |
| 6 | Menyediakan zon penampan di sekitar Rangkaian Ekologi bagi memastikan aktiviti guna tanah di kawasan sekitar selaras dan menyokong peranan Rangkaian Ekologi bagi menghubungkan hutan yang terpisah. | PLANMalaysia @Negeri | I. PBN II. PTG III. JPN IV. JPS V. Jabatan PERHILITAN VI. PBPT VII. PDT / PTD / PTJ | Fasa 1 Fasa 2 | Red Action |