The official reference guide for coordinated and environmentally responsible planning and development within the Central Forest Spine (CFS) area..
PIRECFS 2022 serves as a reference for policymakers, developers, planners, researchers, NGOs and communities involved in the management of CFS areas.
The Master Plan provides guidance for protecting forest habitats, maintaining wildlife connectivity and reducing the impacts of development on biodiversity.
The Central Forest Spine Ecological Linkages Master Plan (PIRECFS) 2022 is presented in two volumes. Volume 1 outlines conservation strategies for the CFS and ecological linkages, while Volume 2 provides eight state-level reports. Both volumes should be read together for a comprehensive understanding of PIRECFS 2022.
Conservation Strategies for the CFS and Ecological Linkages
State-Level Conservation of the CFS and Ecological Linkages
Conservation Strategies for the CFS and Ecological Linkages
Following a review of the guidelines in the 2010 Central Forest Spine Ecological Linkages Master Plan, 12 CFS conservation and management guidelines were developed to address the following areas:
Guidance on the design and construction of dedicated wildlife crossings, including bridges and tunnels, to enable wildlife to cross roads safely.
Approaches to managing and mitigating conflicts between local communities and wildlife.
Measures to prevent and combat illegal hunting within CFS areas.
Guidance on restoring degraded forest areas through the planting of native tree species.
Guidance on protecting river ecosystems and conserving freshwater biodiversity within the CFS.
Guidance on managing riparian buffer zones to protect river ecosystems and provide habitat for wildlife.
Environmental requirements for the planning and development of electricity transmission lines passing through CFS areas.
Guidance on environmentally responsible agricultural practices in areas adjacent to ecological linkages.
Guidance on rehabilitating mining sites to restore ecological functions and minimise environmental impacts.
Guidance on protecting peatland areas as important carbon stores and water resources.
Guidance on sustainable ecotourism development without compromising natural ecosystems.
Guidance on managing settlement and village expansion while maintaining the ecological integrity of the CFS.
Access CFS documents, guidelines, reports and related resources in one place to make information easier to find and support the effective implementation and understanding of CFS initiatives.
Jalur hutan tanpa putus yang menyambung terus dua kompleks hutan besar, menjadi laluan utama haiwan besar seperti Harimau dan Gajah.
Rangkaian “batu loncatan” hutan kecil yang menyambung kawasan terpisah ke Rangkaian Utama, melintasi ladang dan kawasan penduduk.
Mengukuhkan Pemakaian Peruntukan Undang-Undang Akta Orang Asli 1954 (Akta 134)
| Bil | Inisiatif | Pelaksana Utama | Pelaksana Sokongan | Fasa Perlaksanaan | Tahap Kepentingan Perlaksanaan Red ActionSangat Penting, Memerlukan Tindakan SegeraYellow ActionPenting, Boleh Dijalankan Secara SederhanaGreen ActionPerlu Kajian Terperinci Sebelum Pelaksanaan |
|---|---|---|---|---|---|
| 1 | Menggunakan sepenuhnya RT untuk melaksanakan pengurusan tanah hutan dalam negeri secara bersama. | PLANMalaysia @Negeri | I. PBN II. JPN PBPT III. PDT / PTD / PTJ | Fasa 1 Fasa 2 | Red Action |
| 2 | Sempadan kawasan CFS dan Rangkaian Ekologi perlu dimasukkan ke dalam RT bagi memastikan cadangan yang disediakan di dalam Pelan Induk Rangkaian Ekologi CFS 2022 diwartakan bersekali dengan RT di bawah peruntukan Akta 172. | PLANMalaysia @Negeri | I. PBPT II. JPN | Fasa 1 Fasa 2 | Red Action |
| 3 | Mengambil kira Kawasan Sensitif Alam Sekitar (KSAS) di dalam kawasan CFS dengan menyediakan analisis dan cadangan di dalam RT bagi memastikan semua KSAS dipelihara dengan baik. | PLANMalaysia @Negeri | I. PBPT II. PDT / PTD / PTJ III. JPN | Fasa 1 Fasa 2 | Red Action |
| 4 | Semua HTK di dalam daerah dicadangkan untuk diwartakan sebagai HSK. | PLANMalaysia @Negeri | I. PBN II. PDT / PTD / PTJ III. JPN | Fasa 1 Fasa 2 | Red Action |
| 5 | Mengambil kira Kawasan Sensitif Alam Sekitar (KSAS) di dalam kawasan CFS dengan menyediakan analisis dan cadangan di dalam RT bagi memastikan semua KSAS dipelihara dengan baik. | PLANMalaysia @Negeri | I. PBN II. PBPT III. PDT / PTD / PTJ IV. JPN V. JAS VI. JMG VII. JPS VIII. Jabatan Pertanian IX. Jabatan PERHILITAN X. JWN | Fasa 1 Fasa 2 | Red Action |
| 6 | Menyediakan zon penampan di sekitar Rangkaian Ekologi bagi memastikan aktiviti guna tanah di kawasan sekitar selaras dan menyokong peranan Rangkaian Ekologi bagi menghubungkan hutan yang terpisah. | PLANMalaysia @Negeri | I. PBN II. PTG III. JPN IV. JPS V. Jabatan PERHILITAN VI. PBPT VII. PDT / PTD / PTJ | Fasa 1 Fasa 2 | Red Action |
A continuous forest corridor that directly connects two major forest complexes, providing a primary movement route for large wildlife such as tigers and elephants.
A network of small forest “stepping stones” that connects isolated areas to a Primary Linkage across plantations and settlements.
Memperincikan Cadangan Guna Tanah dan Pemeliharaan Kawasan CFS di dalam Rancangan Tempatan (RT).
| Bil | Inisiatif | Pelaksana Utama | Pelaksana Sokongan | Fasa Perlaksanaan | Tahap Kepentingan Perlaksanaan Red ActionSangat Penting, Memerlukan Tindakan SegeraYellow ActionPenting, Boleh Dijalankan Secara SederhanaGreen ActionPerlu Kajian Terperinci Sebelum Pelaksanaan |
|---|---|---|---|---|---|
| 1 | Menggunakan sepenuhnya RT untuk melaksanakan pengurusan tanah hutan dalam negeri secara bersama. | PLANMalaysia @Negeri | I. PBN II. JPN PBPT III. PDT / PTD / PTJ | Fasa 1 Fasa 2 | Red Action |
| 2 | Sempadan kawasan CFS dan Rangkaian Ekologi perlu dimasukkan ke dalam RT bagi memastikan cadangan yang disediakan di dalam Pelan Induk Rangkaian Ekologi CFS 2022 diwartakan bersekali dengan RT di bawah peruntukan Akta 172. | PLANMalaysia @Negeri | I. PBPT II. JPN | Fasa 1 Fasa 2 | Red Action |
| 3 | Mengambil kira Kawasan Sensitif Alam Sekitar (KSAS) di dalam kawasan CFS dengan menyediakan analisis dan cadangan di dalam RT bagi memastikan semua KSAS dipelihara dengan baik. | PLANMalaysia @Negeri | I. PBPT II. PDT / PTD / PTJ III. JPN | Fasa 1 Fasa 2 | Red Action |
| 4 | Semua HTK di dalam daerah dicadangkan untuk diwartakan sebagai HSK. | PLANMalaysia @Negeri | I. PBN II. PDT / PTD / PTJ III. JPN | Fasa 1 Fasa 2 | Red Action |
| 5 | Mengambil kira Kawasan Sensitif Alam Sekitar (KSAS) di dalam kawasan CFS dengan menyediakan analisis dan cadangan di dalam RT bagi memastikan semua KSAS dipelihara dengan baik. | PLANMalaysia @Negeri | I. PBN II. PBPT III. PDT / PTD / PTJ IV. JPN V. JAS VI. JMG VII. JPS VIII. Jabatan Pertanian IX. Jabatan PERHILITAN X. JWN | Fasa 1 Fasa 2 | Red Action |
| 6 | Menyediakan zon penampan di sekitar Rangkaian Ekologi bagi memastikan aktiviti guna tanah di kawasan sekitar selaras dan menyokong peranan Rangkaian Ekologi bagi menghubungkan hutan yang terpisah. | PLANMalaysia @Negeri | I. PBN II. PTG III. JPN IV. JPS V. Jabatan PERHILITAN VI. PBPT VII. PDT / PTD / PTJ | Fasa 1 Fasa 2 | Red Action |